We build the future!
(495) 680-02-71
MainProjectsCurrent projects

Projects

Implemented projects

Current projects





1 2

Gas Compressor station at South Concession Area, Priobskoye field

Gas Compressor station at South Concession Area, Priobskoye field, Khanty-Mansi district, Khanty-Mansi Autonomous Area. Gas Compressor station (GCS) will receive associated petroleum gas (APG) from multiple well platforms of Yuzhno - Priobskoye field and then transport to Yuzhno-Balynskiy gas processing plant. Before transportation gas compresses, drains and supplies to gas pipeline system. If gas pipeline system accepts gas partially surplus will be supplied as a fuel gas to Yuzhno - Priobskaya power plant. Nominal capacity of GCS inputs 500 million m3 per year, stable operation with two compressor lines 125 ... 625 million m3.

The associated petroleum Gas Turbine Power Plant. The Power Centre №2

Associated petroleum Gas Turbine Power Plant. The Power Centre №2 is a centralized gathering facility of well production, Central-Horeyverskoe field (block 1,2,3,4), Nenetskiy Autonomous Area, Arkhangelsk region. Installed capacity 72 MW (First stage development - 36 MW).

List of main equipment for the Power Centre №2:

  • six gas-turbine power units EGEС-12С;
  • gas-turbine unit GTU-12PG2;
  • turbogenerator TC-12-2-RUHLZ;
  • hot-water boiler-utilizer.
Gas-turbine units use associated petroleum gas from filling center of well production in Central-Horeyverskoe field. In structure of the Power Centre №2 is projected block construction for preparing fuel gas with booster compressor stations.
1 2